The Challenge

Central Electric Power Cooperative is a transmission cooperative that constructs and maintains the substations and transmission lines for eight Missouri distribution cooperatives in east-central Missouri. Building space needs as well as site constraints like topography and shape added an extra layer of complexity to CEPC’s facility challenges. M+H evaluated and master planned the site to maximize the buildable area, and developed efficient and logical site circulation and logistics.

Central Electric

The Solution

The new two-story building is accessible to the warehouse on the upper level and vehicle storage on the lower level, utilizing the building to resolve the site’s change in grade. The lower-level concrete walls act as a retaining wall. The building envelope is a pre-engineered metal building with insulated, composite metal wall panels that are are pre-finished inside and out, eliminating the need for many of the interior finish costs.

Central Electric

Size & Specs

  • 35,200 SF

Services

  • 3D Modeling
  • Master Planning
  • Immersive Design
  • Space Planning